"SHALSET GROUP" LLC carried out the repair of the roof of the 35/6/0.4 kV substation building at SOCAR's Methanol Plant. The works included the application of a membrane insulation layer and a subsequent testing stage to guarantee full water-tightness and the long-term durability of the structure.
Customer: "Methanol Plant" of the State Oil Company of the Azerbaijan Republic (SOCAR).
Copyright 2026 | Bütün hüquqlar qorunur.