"SHALSET GROUP" LLC completed the installation of a protective metal cage around the pipelines for the facility "Installation of a drainage system in the underground tunnel through which SOCAR's pipelines pass," located on the section of the road to the Heydar Aliyev Airport that runs in front of the Baku Olympic Stadium.
The scope of works, delivered on schedule and to a high quality standard, included: erecting the supports of the metal frame; fabricating the metal frames and the protective cage structure; removing the soil beneath the foundation and laying a gravel preparation layer; constructing a concrete foundation belt beneath the frames along the perimeter; cleaning the metal structures of rust and applying an anti-corrosion coating followed by synthetic oil-based paint; fabricating and installing a mesh door with a metal frame; and laying a 10 cm gravel layer inside the cage.
Customer: Heydar Aliyev Oil Refinery.