+994 12 493 36 84
Baz. ert. - Cümə 09:00 - 18:00
Bakı, Nizami küç. 196
Home page
About us
About company
Certificates
Job vacancy
Projects
Contacts
Home page
About us
About company
Certificates
Job vacancy
Projects
Contacts
+994 12 493 36 84
Projects
Ana səhifə
Projects
Construction of a water pipeline between the Qumyataq Pump Station and the Heydar Aliyev Oil Refinery.
Neutralization of tank-bottom sludge, cleaning of oil-contaminated areas and their removal from the refinery territory
Construction of a 24x24x8 m(H) metal-structure workshop in the Shongar settlement for "SOCAR Waste Management Complex" LLC
Repair works on the H=120 metre chimney of unit No. 43 of production No. 4 of the Heydar Aliyev Oil Refinery.
Construction of the Dashgil Terminal within the "Umid-Babek" offshore block development project
Installation of a drainage system in the underground tunnel through which the pipelines pass
Cleaning of ponds from oil sludge in the Surakhani and Sabunchu districts
Painting of the reinforced-concrete chimney of the "Ethylene-Polyethylene" plant
Repair of the roof of the substation building of SOCAR's Methanol Plant
Major overhaul of the flare unit of the "Water supply, water cooling and sewerage" section
1
2
Müraciətinizi əlaqə bölməsindən
bizə ünvanlaya bilərsiniz
MƏKTUB YAZ
Copyright 2026 | Bütün hüquqlar qorunur.